- Ripped out all the carpets from the house
- Rewired the entire place
- Installed a new boiler and unvented cylinder
- Knocked down the bathroom wall
- Put the bathroom wall back up (a little more to the left)
- Reinstalled all the bathroom fixtures (well almost)
Some photos below before and current for the bathroom.
No comments:
Post a Comment