- Finishing tiling the shower enclosure
- Replacing some sagging plaster on the ceiling with plasterboard - this involved going into the loft to screw in some additional support
- Grabbing a kebab
- Bonding plastering the back corner where the masonry was still exposed
- PVA'ing the plasterboard with a 5:1 mixture in preparation for tiling (see https://www.youtube.com/watch?v=dvuejJBzMKQ as to why)
- Grouting - the kiddies came home around this time and were dying to help. We let them sponge the excess grout off afterwards
- Going for a curry and a pint at the local Indian restaurant
Overall, a really productive day. It was great to have an extra pair of hands - and better company than Capital Radio - Thanks Wince!