Today was supposed to be move in day. Obviously without a floor in the bathroom this wasn't going to happen. We've made the very wise choice of deferring the move day until Wednesday.
My new plan was to tile the walls, but given the floor is missing and so are patches of wall, I've decided to give that some focus
So the results of today:
- plywood subfloor is down
- much less brick showing on the wall
- many of the joints are plastered over
I dotted and dabbed some plasterboard to the wall using a special adhesive from Wickes. The only problem is that it comes in a 25kg bag. WTF. Who needs that much? I had to take an uber home
No comments:
Post a Comment