Day 3 we started the electrical work. I met electrician Martin at the house at 8am. Got to peek into the loft and it looks like there will be plenty of height for a conversation later on. Good news. Martin wasted no time pulling wires and ripping out sockets. Looks like he's off to a good start. I did some clean up around the back to stay out of his way.
Greg came by to check out the bathroom window, it doesn't look good. I think we'll have 3 options : 1) shrink the window down making it quite narrow. 2) shift the window over requiring a lot of building work Ipricey, intrusive) or 3) keep everything in place for now (not a great layout). I'm leaning towards the last option for the time being.
Finally, I signed up for a Travis Perkins account. It's a 5 min walk away - very handy.
Love the blog Scott! Excited to watch the process. I'll be over soon enough to help with the renos.
ReplyDelete