Number one priority this weekend was to finish the bathroom flooring as the remaining 2 tiles finally arrived last Thursday.
After playing around with a couple of cuts Saturday morning I realised that my plan to cut a 5 cm strip across the doorway would result in a couple of visible rough edges. I opted for the more difficult option of trying to trace out the doorway and angled wall.
I tackled this by first making a cardboard template to the dimensions of the tile and taking some high tech tools, i.e.scissors, to get the correct shape. Results were good and everything for like it was supposed to. After Care went out and the kids feel asleep, I finished off the grouting allowing it time to dry overnight. Finally on Sunday, I finished it off with a piece of door trim.
So we've now gone from ugly old floor, to no floor to finished floor. Looking upwards now to the walls.
No comments:
Post a Comment