Saturday, March 10, 2018

Day 865:Getting on the housing ladder

Seeing that I was about to lift about 29 square meters of chipboard and about 18 2x4's up into the attic (about 420kg of wood) not to mention all the junk we were going to hide up there afterwards, my little leaning telescopic ladder thing wasn't going to cut it. I'm also sure it would have probably ended up with a hospital visit at some point.


So it was time to invest in a proper loft ladder. Luckily ScrewFix read my mind and put one on sale for me :). The one that we bought was the 3 piece aluminum extension type made for "light use" with a capacity of 150kg. I don't weight that much so I'm guessing heavy use with a light person maybe also counts. Regardless, this ladder would be at least fixed to the building so less chance of getting frequent flyer miles at the A&E.


These ladders are super easy to install. The kit came with hatch door hardware as well - but I already too care of that earlier (here). The idea is that they fold in 3 and collapse into an open area of the loft. The only difficulty was that the area of the loft where we have access doesn't provide for a whole lot of room. I measured the length and the height but the round arc was the issue. Will have to just test it out.

The other challenge with installing the ladder was that you still need a second ladder to get up there to fix everything. Or a really trusting friend (that you won't just leave them up there).


I used 60mm screws to hold it in place and make sure that I was screwing down to something more than just chipboard. The ladder is on hinges and slides down into place. It was adjustable to 3m so lots of height as well - think we are at about 2.8m extended.


And there you have it - a much better and safer way of getting up into the loft. Now I just need to carry my 400+ kg of materials up the ladder. Gasp!

Wednesday, March 7, 2018

Day 862: Lofty ambitions

Now that the Monster in the Attic has been beaten, we can finally venture out into the rest of the loft area. Our intent was to board it over to provide some storage space until which time as we can finally build into the loft (on Day 14,684 at the rate we're going). Generally, boarding over the loft is quite a simple task (see my previous post here), however as usual, I got a bit carried away.

But like any good Brit, I'll blame everything on the weather. 

Last week, the UK got hit by the Beast from the East - a cold front from Siberia that dropped treacherous snow and cold across the country bringing it to its knees.




Canadians have a name for this kind of weather, "a normal winter's day"



But hey, I'm in the UK now so I felt it was my patriotic duty here to overreact just like everyone else. This unwarranted response manifested itself in my completely over-engineering the loft boarding exercise. 

OK, granted houses in this country are not exactly built to withstand sub-zero temperatures very well and our place wasn't exactly the tropics during this recent cold snap. But, this weather only happens once every 5 or so years. 

Regardless, on impulse I decided we were not only going to board over the loft .. we were also going to insulate. So the order went in, and it arrived today.



As you can see, there is a lot of stuff ...

Basically, the idea is to top-up the 100mm insulation currently in place with another 100mm and then board over that. The building regs recommend another 170mm; but the loft board will provide some insulation and this way I can use 2x4's (or whatever the metric equivalent is) running perpendicular to the current joists vs having to use plastic stilts (see here). Besides, I didn't want to get too carried away with my overreaction.


Anyway, I've once again got a house full of building materials that I need to put somewhere. Stay tuned over the next week(s) as I start moving all this material up into the loft area. I've got my work cut out for me. 

Wednesday, February 14, 2018

Day 841: Turning 10,000

















The Suburbiton Project turned 10,000 yesterday! Thank you to all my loyal followers for tuning into insightful posts on interesting topics such as paint drying, cement pouring and filling up a skip. With exciting and topical subjects like these, I'm actually surprised the number is only 10,000.

And yes, I know the number sounds impressive until you compare it against:

  • Google - 6,572,041 hits per day
  • YouTube - 6,035,153 hits per day
  • Facebook - 4,480,024 hits per day
  • WaitButWhy - 50,000 hits per day (a blog on procrastination, imagine if people actually got around to visiting this site)
It still may be a couple of years before we're able to displace these sites, but I don't think it's out of reach. However, it's great to see how a site we created 2 years ago to document our adventures in refurbishing an old house has progressed.

What's been most inspiring has been comments from people that randomly came across the site on the Internet. I've apparently inspired a few people to tear apart their houses and gardens (and hopefully put them back together again).

For those interested, I've pasted some of key site statistics below:


























Canada just edges the UK in this regard (thanks Joan!). 


















So apparently, pouring concrete is the 3rd most popular topic in home renovation - who knew?

The house is nowhere near finished so lots more exciting topics to come in the year ahead. But in the meantime, thanks for supporting us and helping us achieve this truly monumental milestone.



Wednesday, February 7, 2018

Day 831: The monster in the attic

Once, a long, long time ago .. before many of us would ever remember, a deep, dark secret was
hidden away never to see daylight ever again .. or so it was thought, until this weekend when Scott battled The Monster in the Attic





















This beast was as ghastly as you would imagine, large, scary, hideously deformed .. it was a challenge unlike any other that I had ever faced.


The monster that I'm referring to is the old galvanised steel water tank in the loft. My guess is that it's been residing in it's current home for over 50 years. For those unfamiliar with Victorian (i.e. antique) plumbing, this was installed to provide water pressure (head) back in the day. The tank would be filled by the mains until it reached the top and gravity would provide pressure for showers and toilets. The water wasn't drinkable, so the kitchen had a mains feed. For those wanting to learn more, click here (vented system).

Like the lead pipes, wood paneling or psychedelic wallpaper, this was part of the "original charm" of the house that we chose not to keep. Before we moved in, Tom disconnected this water box and hooked up everything to the mains pressure. The shower is much stronger and even the water in our toilet is drinkable (theoretically).

But the monster still remained ... just waiting for it's moment. Being massive and well over 30kg, this makes sense.

So why tackle the sleeping beast. Bascially, it would have had to go at some point. I'd like to use the loft for extra storage and this monster was guarding the way to the main loft area (and of course because it makes for a good story).

So how do you get something this massive and heavy out of a loft hatch? The Interweb has many answers and many of these were shot down. Some propose chopping it to bits with an angle grinder, but this gives off sparks and becomes a fire hazard. Some mention chopping it up with a jigsaw, but this apparently is noisy, slow and goes through multiple blades. A reciprocating, multi-saw would have worked, but I don't have one. So my plan was to tackle this beast whole hog.

Clearly this was no easy task so lots of planning was involved. My weapon of choice was a pulley system. This was good for 180kg, so enough for even the gnarliest of beasts. But how to mount it? I opted to mount a hook from the roof joists. But having no idea what the vertical strength of these joists are, and the fact that none spanned over the centre of the loft hatch, I ran a couple of 2x4's across the span and shot in lots of 4" screws to fasten them together and to the joists.

Next I purchased a heavy duty hook to which I'd mount the pulley system. All this under the watchful eye of the monster - it didn't seem the slightest bit concerned. Was there something that I was missing?


So that was enough for a day, and because I was also busy pouring cement (see previous blog post)

The next weekend, I built up the courage to once again face the attic monster. First was to move it from it's home for the past 50 years. I had to slide it over the loft opening, so I cut 3 - 2x4's to cover the span, screwed them down and just slid it across.


























Then, and only then, did the true magnitude of the battle I was about to face truly show itself. What I had guessed was a square tank was actually a rectangular tank - 80cm wide vs the 60cm I had been expecting. This was a problem because the loft hatch is also just over 80cm wide. And to top that, there were still pipe fixings and valves sticking out of the sides. Out came the hacksaw and the first battle began.

It took a couple of hours of intense fighting before  it was clear that I was going to win this fight. The monster was injured but far from beaten.

Next came the real scary part, trying to hoist this thing down with the pulley system.

I drilled out six holes in the frame to run some rope through. I took some high strength nylon rope and tied it in a double figure 8 pattern with knots at the ends. According to many websites (like here), this is the strongest way to tie 2 pieces of rope together. I wasn't going to take any chances.


























Everything should hold now .. all spec'd for >150kg. But there is always that niggling concern in the back of the mind. Well time to test it out. Monster, it's just you and me.


























It was actually easier than I had expected. Whew. The monster gave a few fighting kicks here and there - like almost not getting out of the hatch - but it was clear that it had met its match.


























Once it was out of the loft, it lost some of its fierceness. I was able to navigate it down the stairs and using a hand truck, out the front door to it's new home in the bottom of the garden. I've heard that these things are worth something for scrap metal, so it may end up out front next. Let's see.

Either way, the monster is no longer gaurding the entrance to the loft and terrorising the house. Over subsequent blogs, you'll see me put in some loft lights and board over the loft joists to turn this into usable storage space. But that's another story.

In hindsight, this was probably a bit pointless, a bit dangerous and I should have left it in situ. For those ever tackling this kind of task, I'd assume that this should always be the first choice. Leave sleeping beasts where they lie. But if you feel the need to attack one, choose your weapons wisely. I'd go with the reciprocating saw as my first choice, the pulley system as a backup if all else fails.

But there you go, the end to this chapter in the scary story. And yes, it had a happy ending.

Thursday, February 1, 2018

Day 827: Plugging a gap

The front room was starting to look half decent. The only problem was the gap in the middle of it. Cold air was getting in and it looked pretty unsightly. We needed to find something to fill the space.


Luckily the guys at Galleon Fireplaces had the perfect solution. Plug the gap with a new log burning stove. We went with a 5kw version made by Capital Fireplaces - mostly because anything bigger and we'd be able to start drying clay pottery in there. Nope, it was just the aesthetics of having something intentionally burning in the room and maybe a little extra coziness on winter nights.


We knew the chimney worked as there was a gas stove in there when we first moved in. We had the chimney swept and inspected first before confirming this particular job - required by code.

Also, the chimney needed to be lined so that the fire is what's putting the grin on our face - not the carbon monoxide leaking out into the house. The guys spent a lot more time than expected running the pipe down the chimney. I did confirm with them that this was both approved for woodstoves and convenient passage of jolly old men. They also needed to put a new cap on top of the chimney suitable for wood burners. And of course, it being London and us needing to do work outside, it rained ....


Next once the liner was installed, next came the register plate which is just the metal bit that goes on the top and connects in with the pipe.

The guys also worked on the hearth which is honed black granite. Black granite was chosen vs slate or limestone as it was the hardest wearing material and avoided scuffs and scratches well. With a fire and a couple of kids, felt this was a good option to go with. Also, all my hard work on getting the floor level (see here) was probably a but unnecessary - they put down new mortar under the hearth and re-leveled the entire thing. Well hopefully my work made this a little bit easier - or at least an entertaining blog entry :) 

Nice of them to put down covering so as not to wreck our "lovely" floor. They were super considerate, although in this case, anything they did to the floor would likely improve its current state.


Next came all the pretty stuff, namely the limestone surround. I think this may have been the first time that Care and I have agreed on something completely without the need for 10,000 samples first. Progress maybe? No, unfortunately the 10,000 flooring samples sitting in the room would suggest otherwise.

And that was the end of Day 1. They were doing a great job so I wasn't going to rush them. 

So Day 2, I was back at work so Care had to double as photographer. It took them a few more hours to install the rest of the surround, wood burner, insert and calking/finishing. It seemed a bit comical that we covered the original rustic bricks with faux "rustic" bricks but that is apparently what you do. Don't ask.

And there you go, the guys from Galleon standing proudly by their work. Nice job!


And the stove in action with a nice oak log. I learned by trial and error that logs are both heavy to carry home from the store and $&£@!!!! difficult to get burning. My recommendation is going for a softer wood like ash, unless you have a massive incinerator wood stove.

Now that the stove is installed, we can finish off the flooring - after of course deciding which of the 10,000 shades of wood we prefer. Arrgh!

Well at least the unsightly gap in the wall is now plugged with something a bit more pleasant to the eye (and warm on the toes),



Always good to have some before / after pictures to show progress. Technically this is a during / during picture, but you get the idea. Whenever we finish, we'll do a proper before/during/after comparison - but that is still a long, long way away.



Wednesday, January 31, 2018

Day 823: Pour some concrete on me

This fireplace 'aint fit, Scott, c'mon get on it
Lookin' busted up just like it was blitzed 

Lookin' like a mess, like a dog's breakfast
Demolitions done man, time to invest
Razzle 'n' a dazzle 'n' a flash a little light
Put it back together, Scott, make it right
Sometime, anytime, make it nice and neat
This little fireplace needs some concrete
So c'mon, take a bag, open it up
Add some water, mix it up
Pour some concrete on it
Ooh, 'cause it's way too rough
Pour some concrete on it
C'mon, get it level and stuff
Pour your concrete on it
Just can't get enough...

We're getting a wood-burning stove installed. Mostly for aesthetics but it will add a bit of warmth to the house too. Everything is ready to go. Chimney is swept and inspected and all good. The only thing remaining is the lousy base. It's rough and crumbling and probably not a good starting place to rest the stove hearth on. So on comes the concrete.

Now the question is, how much (in kg) would you guess this requires?


The first step is to add some SBR to make the cement stick to the substrate and not have all the moisture sucked away before it dries. I'm sure this is factually incorrect - but it seems that you use PVA for plaster and SBR for cement for roughly the same reasons. 


Then on went the cement. This is the ScrewFix "No Nonsense" brand which I've had luck with on other products so worth a try. 


It went on fine, just not as much coverage as I expected. I ended up putting 15 kg of the stuff on and still had a lot of filling to go. As the result was also not as flat as I'd expected it to be, I thought I'd give floor leveller a try. This is the U-Can brand from B&Q. Floor leveller goes on like a thick custard and uses gravity to flatten and make it level.

Rather than provide you with a lousy how-to, please check out the video here. So inspired by the hairdresser, off I went to level the recess. Yes U-Can!


And there you go, a level floor. I should mention that the first time I poured, I discovered that there wasn't a good seal in one of the corners and the custard like mixture leaked away on one side. The first result was actually less level then when I started. The second attempt worked as expected however.


So total pouring to get this thing filled

15 kg of concrete
15 kg of leveller

30kg. 

No wonder my back hurts. But at least this thing is proper solid now. On with the stove which, as I type, is getting installed .. stay tuned.

Monday, January 1, 2018

Day 786: A re-launch and an apology

As 2017 rolls to an end, it's time to reflect. Reflect on all the great things done in the year and all the things not done .. such as updating this blog!



























I haven't been sitting idle, I just haven't been blogging (almost as bad). So over the holiday, I've got things back on track and caught the blog up on all the happenings of H2 2017. I've turned off the Facebook updates while I've been doing this to keep from spamming everyone's feeds. It's back on now so you'll once again see links to the best DIY-on-a-Victorian-semi-in-Subirbiton website on the Internet (at least I hope so, if not let me know who is stealing my thunder)

But please read through some of the old posts. My work is like a fine wine .. my recollection of the activity gets better the longer it ages.

So my new year's resolution is to blog more, get my readers back and keep things interesting. This year, I may even try posting some videos.

I've also been told by the site management that my project delivery has been very unprofessional - late, not well communicated etc. If Care was paying me, I'd have been sacked a long time ago.

To step up the professionalism of the work, I've created a project plan. Somewhere on the links to the right, you should see a link to a Gantt chart showing what we've got planned and how we (erm .. I) are doing against the plan. Few things in life are certain, but one thing that I can guarantee is that in 365 days from now, nothing will have gone to plan.